Name of assignment or project: 400 kV GIS SARIR Turnkey Project
Year: 2009 - 2010
Location: Sarir Libya
Client: General Electric Company of Libya ( GECOL )
Main project features: 400 kV GIS Substation with Switch Yard
Position held: Senior Civil Engineer
Activities performed: Site Supervision and Quality Assurance & Control
Name of assignment or project: Consultancy Services for Supervision of Quang Ninh Thermal Power
Plant 4 x 300 MW
Year: 2009
Location: Quang Ninh Ha Long City Vietnam
Client: Quang Ninh Thermal Power - Joint Stock Company
Halong Vietnam
Main project features: Construction of a new Coal Fired Thermal
Power Plant
Position held: Senior Civil Engineer
Activities performed: Site Supervision, Design review Quality C.
Year: 2009 - 2010
Location: Sarir Libya
Client: General Electric Company of Libya ( GECOL )
Main project features: 400 kV GIS Substation with Switch Yard
Position held: Senior Civil Engineer
Activities performed: Site Supervision and Quality Assurance & Control
Name of assignment or project: Consultancy Services for Supervision of Quang Ninh Thermal Power
Plant 4 x 300 MW
Year: 2009
Location: Quang Ninh Ha Long City Vietnam
Client: Quang Ninh Thermal Power - Joint Stock Company
Halong Vietnam
Main project features: Construction of a new Coal Fired Thermal
Power Plant
Position held: Senior Civil Engineer
Activities performed: Site Supervision, Design review Quality C.
Name of assignment or project: Nehuenco Power Plant
Year: 1997
Location: Nehuenco (Chile)
Client: COLBUN S.A. Chile
Main project features: C.C. Power Plant Gas and Steam turbine, BOP, 370 MW
Positions held: Civil Site Engineer
Activities performed: Site Supervision within a team of Civi Eng.
Year: 1997
Location: Nehuenco (Chile)
Client: COLBUN S.A. Chile
Main project features: C.C. Power Plant Gas and Steam turbine, BOP, 370 MW
Positions held: Civil Site Engineer