19.10.2025 aktualisiert


verifiziert
Premiumkunde
100 % verfügbarTest Automation Engineer & Test Manager & Performance Tester & Accessibility Tester
Munich, Deutschland
Deutschland +2
Bacherlor of ScienceSkills
SeleniumTestmanagementCypress (Frontend-Testing)Test AutomatisierungLast und PerformancetestTestanalystREST AssuredBarrierefreiheitRelease ManagementScrum MasterAgile MethodenPlaywright
Playwright, Cypress, Postman, JMeter, Wiremock, Release Management, Grafana, Dynatrace, OpenShift, Graylog, Sonar, Jenkins, Angular, Typescript, Java Script, Confluence, Jira, Kubernetes, HTML5, CSS, Npm, Git, Bitbucket, SonarQ, NexusIQ, VSCode, web application, React, single page application, programming language, integration tests, Cucumber, CSS Framework, State Management, SEO, Python, Gitlab CI, Kibana, Docker, Jäger, LOUIS, Humio, Swagger UI, PostgresDB, UI, compatibility testing, Java, Serenity, Selenium Webdriver, Inlux DB, Eclipse, IntelliJ, Prometheus, Accessibility testing, user stories, Scrum, pyramid, Protractor, CI/CD, Webstorm, Pact, JUnit, Salesforce, test case, automated tests, Selenium WebDriver/Java, Javascript, Selenium, Kanban, Coding, CSS3, JavaScript ES6, MobX, js, Enzyme, Cypress, Slack, Trello Monitoring, DB, Influx DB, MySQL, Node, Micro Services, yarn, WebPack, Kafka, Microsoft Office, MS Word, MS Excel, MS PowerPoint, MS Outlook, MS OneNote, MS SharePoint, MS Power BI, MS Project, MS Teams, GitHub, GitLab, Notepad++, Server, Amazon Web Services, Material UI/UX, semantic-ui, material-ui, bootstrap, Ant Design, Emotion Css, Styled Components, Test Automation, Cypress 10, Humio 9, Python 8, AWS, Accessibility Testing
Sprachen
DeutschMutterspracheEnglischverhandlungssicher
Projekthistorie
Project: KuZaMa - Reorganization of a failed project to secure payment transactions
In the current KuZaMa project at Debeka, I was significantly involved as Scrum Master and Test Automation Lead in the restructuring of a severely faulty and unreliable system. The project, which originally had significant deployment problems, configuration errors and a lack of documentation, was stabilized to production readiness within six months.
My role included:
In the current KuZaMa project at Debeka, I was significantly involved as Scrum Master and Test Automation Lead in the restructuring of a severely faulty and unreliable system. The project, which originally had significant deployment problems, configuration errors and a lack of documentation, was stabilized to production readiness within six months.
My role included:
- Test automation lead - restoration of system stability & quality assurance:
- Remediation of a faulty and unreliable test and release process by introducing a structured, automated regression test system.
- Building a complete test strategy from the ground up, including documentation and test coverage for all critical business processes.
- Development of 400 functional acceptance test cases within six months, parallelized through multiple refactoring cycles and optimized for highly efficient, low-maintenance execution in just 25 minutes - critical for fast feedback on hotfixes.
- Complete automation of the authorization concept with approx. 6000 test cases via front-end and API endpoints, resulting in complete end-to-end protection of the system.
- Introduction of a strict quality process in which even the smallest software change is only released after extensive regression testing in order to prevent errors in production.
- Scrum Master & Management - restructuring of the team & process optimization:
- Rebuilding an efficient test team with five highly motivated junior testers, some of whom had little programming experience - intensive training and knowledge building in test automation.
- Optimization of collaboration between test automation specialists, test analysts and business analysts:
- Test automation engineers developed generic, reusable test steps.
- Based on this, test analysts and business analysts were able to write Cucumber test cases that were directly ready for automation without in-depth automation knowledge.
- Result: Efficient, scalable test case creation with high test coverage.
- Introduction of structural improvements to efficiently manage the team in a highly time-critical project path and stabilize the development processes.
- Release Management - From unusable deployments to stable releases:
- Ensuring software quality in new releases through automated regression tests and error analyses
- Quality assurance prior to deployment on all environments to ensure the stability of the test and production systems.
- Early identification of faulty releases to avoid potential blockages in the development process
Familiarizing employees with the topics:
- Test automation:
- Cypress and Selenium
- Cucumber
- Gherkin
- Regulations
- Test methodology:
- agile testing methodology
- performance testing
- functional testing
- Test analysis:
- user story to manual/automated test case
- behaviour driven development
- Cucumber
- Gherkin
Project Kern:
The project at Debeka revolved around the development and enhancement of a core system designed to meticulously store and manage comprehensive datasets, including customer and partner master data, sensitive health information, and intricate details of commission calculations. This robust system is pivotal in facilitating seamless integration of data pertaining to a wide range of insurance products, ensuring accuracy, security, and accessibility.
Test Automation Engineer:
The project at Debeka revolved around the development and enhancement of a core system designed to meticulously store and manage comprehensive datasets, including customer and partner master data, sensitive health information, and intricate details of commission calculations. This robust system is pivotal in facilitating seamless integration of data pertaining to a wide range of insurance products, ensuring accuracy, security, and accessibility.
Test Automation Engineer:
- implementing test cases in cypress
- migration of 600 test cases from cypress to playwright and shifting from surface tests to data driven api tests:
- advantages:
- reduced execution time from 3 hours to 10 minutes
- increased test coverage
- parallel test execution
- simpler maintenance:
- reduced lines of testcode from 5780 lines to 2640
- reduced cucumber lines from 7449 to 2300